EasyManuals Logo
Home>Agilent Technologies>Laboratory Equipment>G1314B VWD

Agilent Technologies G1314B VWD User Manual

Agilent Technologies G1314B VWD
184 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #96 background imageLoading...
Page #96 background image
96 Agilent 1200 Preparative Pump User Manual
6 Troubleshooting and Diagnostics
Pressure Test
Running the Pressure Test
1 Select the pressure test from the test selection menu.
2 Start the test and follow the instructions.
3 Remove the blanking nut after finishing the test and reconnect all
capillaries.
When If problems with small leaks are suspected After maintenance of flow-path components (e.g. pump
seals, injection seal) to prove pressure tightness up to 350 bar.
Tools required ¼-inch” wrench
Parts required # Part number Description
1 01080-83202 Blank nut
500 ml Isopropanol
Preparations Thoroughly flush the entire system with Isopropanol and remove all contaminations and
potential air bubbles, release the pressure in the system and position the blank nut
NOTE
Make absolutely sure that all parts of the flow path that are part of the test are very
thoroughly flushed with IPA before starting to pressurize the system! Any trace of other
solvents or the smallest air bubble inside the flow path definitely will cause the test to fail!
NOTE
Finishing the test will release the pressure in the system.
NOTE
For detailed instructions refer to the Agilent LMD Tool.

Table of Contents

Other manuals for Agilent Technologies G1314B VWD

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Agilent Technologies G1314B VWD and is the answer not in the manual?

Agilent Technologies G1314B VWD Specifications

General IconGeneral
BrandAgilent Technologies
ModelG1314B VWD
CategoryLaboratory Equipment
LanguageEnglish

Related product manuals