EasyManua.ls Logo

Akw Itherm - Functional Checks and Testing; Power Button Functionality; Control Knob Responsiveness; Importance of Commissioning Tests

Akw Itherm
36 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
30
© 2015 AKW 14-019-002-08
Commissioning
Functional Checks & Testing
It is important to complete the installation and record the commissioning
tests to provide a performance reference point for future tests.
Press and release the power button
Checking the Temperature Control Checking the Flow Control
Checking the Power Button
Confirm the operation of the Temperature and Flow increase and
decrease knobs, whilst ensuring all lights are functioning
Press the Power button to revert to standby mode

Related product manuals