EasyManua.ls Logo

ALENCON PODD - PODD Applications; SPOT System

Default Icon
38 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
PODD – Installation, Operation and Maintenance Manual
A l e n c o n S y s t e m s L L C - P a g e | 14
6 PODD Applications
The PODD is ideal for commercial or utility scale photovoltaic (PV) systems that have Alencon
power conversion devices including the SPOT, BOSS, and/or GARD. This section details how
each of Alencon’s devices can be connected over a network using the PODD.
6.1 SPOT System
Alencon’s String Power Optimiziers and Transmitters (SPOTs) have up to four inputs and
can accommodate from 4 to 8 strings. Depending on the size and need of a PV array, the
SPOTs can be setup with a Single or Multi PODD configuration.
Figure 8: SPOT ACE System Architecture with Multi PODD configuration
NOTE: Each type of device (SPOT, BOSS, and GARD) can have communications daisy-
chained with any other type of device and still connected to a Local PODD.

Table of Contents