EasyManua.ls Logo

Alfa Laval PHE - Installation Guide; Pre-Installation Checks

Alfa Laval PHE
24 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
English Installation
-10 Plate Heat Exchanger 3490008529 rev 2012-01
EN
EN
DE
FR
ES
PT
IT
SV
DA
FI
NL
RU
PL
NO
HU
SK
CS
SL
LV
LT
ET
EL
BG
RO
ZH
BG
Installation
Before installation
Consider before installation
Before connecting any piping, make sure all for-
eign objects have been flushed out of the piping
system that should be connected to the PHE.
Before start-up check that all tightening bolts are
firmly tightened and that the correct measure-
ments of the plate pack, refer to PHE drawing.
When connecting the piping system make sure
the pipes do not subject the PHE to stress or
strain.
To avoid water hammer, do not use fast-closing
valves.
In automated installations, the stopping and start-
ing of pumps and actuation of valves should be
programmed so that the resulting amplitude and
frequency of the pressure variation will be as low
as possible.
If pressure variance is expected install efficient
dampers.
Make sure that no air remains within the PHE.
Safety valves shall be installed according to cur-
rent pressure vessel regulations.
It is recommended that protective sheets are
used to cover the plate pack. Protect against
leakage of hot or aggressive fluids and the hot
plate pack
For each model, design pressures and tempera-
tures are marked on the identification plate.
These shall not be exceeded.

Related product manuals