Maintenance
Step9
Mountprotectionsheets(ifprovided).
Step10
Connectpipes.
Step11
IfthePHEdoesnotsealwhenthemeasureAhasbeenreached,
itcanbetightenedfurthertoAminus0.5%.
Note!
ForTL6-B:WhenusingframeASMEstandard!
PHEunitswithpressurevesselcodeASMEare
equippedwithtopandbottombolts.Tightenthose
boltsaftertheprocedureabovehasbeennished
orslightlybeforethedimensionAisreached.
Pressuretestaftermaintenance
Beforestart-upofproduction,wheneverplatesorgasketshavebeenremoved,insertedor
exchanged,itisstronglyrecommendedtoperformapressuretesttoconrmtheinternaland
externalsealingfunctionofthePHE.Atthistest,onemediasideatatimemustbetestedwith
theothersideopentotheambientpressure.
Caution!
Thepressuretestingshallbeperformedatapressureequaltotheoperatingpressureof
theactualunitbutneverabovethedesignpressureasstatedonthenameplate.
Therecommendedtesttimeis10minutesforeachmedia.
PleaseconsultthelocalAlfaLavalrepresentativeofthesupplierforadviceonthepressure
testingprocedure.
DocumentIDLanguageEdition
28InstructionManual-PlateHeatExchangers3490010217EN2014-11