EasyManua.ls Logo

Alfa level M3 - Installation Guide; Pre-installation Checks and Requirements

Default Icon
30 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installation
Installation
Beforeinstallation
Toconsiderbeforeinstallation
Beforeconnectinganypiping,makesureallforeignobjectshavebeenushedoutofthe
pipingsystemthatshouldbeconnectedtothePHE.
Beforestart-upcheckthatalltighteningboltsarermlytightenedandthatthecorrect
measurementsoftheplatepack,refertoPHEdrawing.
WhenconnectingthepipingsystemmakesurethepipesdonotsubjectthePHEtostress
orstrain.
T oavoidwaterhammer,donotusefast-closingvalves.
MakesurethatnoairremainswithinthePHE.
Safetyvalvesshallbeinstalledaccordingtocurrentpressurevesselregulations.
Itisrecommendedthatprotectivesheetsareusedtocovertheplatepack.Protectagainst
leakageofhotoraggressiveuidsandthehotplatepack
IfthePHEsurfacetemperatureisexpectedtobehotorcoldtakeprotectiveactions,such
asinsulatethePHE,toavoidriskforpersonnelinjuries.Ensurethatrequiredactionare
accordingtolocalregulation.
Foreachmodel,designpressuresandtemperaturesaremarkedonthenameplate.These
shallnotbeexceeded.
Requirements
0000000
0000000
0000
0000
0000
00
00
00
00
00
00000
00000
0
0
B
Space
Aminimumfreespaceisneededforliftingplatesinandout.RefertothedeliveredPHEdrawing.
Foundation
Installonaatfoundationgivingenoughsupporttotheframe.
Elbow
TomakeiteasiertodisconnectthePHE,anelbowshouldbettedtotheconnectioninthe
pressureplate,directedupwardsorsideways,andwithanotherangelocatedjustoutsidethe
contourofthePlateHeatExchanger.
Shut-offvalve
TobeabletoopenthePHE,shut-offvalvesshouldbeprovidedinallconnections.
DocumentIDLanguageEdition
3490010217EN2014-11InstructionManual-PlateHeatExchangers11
EN