EasyManua.ls Logo

Allied Telesis AT-8016F/MT - Chapter 2 Installation

Allied Telesis AT-8016F/MT
116 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
47
Chapter 2
Installation
This chapter contains the installation procedures for the switch. The
chapter contains the following sections:
”Reviewing Safety Precautions” on page 48
”Selecting a Site for the Switch” on page 49
”Planning the Installation” on page 50
”Unpacking the Switch” on page 52
”Installing the Switch in a Rack” on page 53
”Installing an Optional GBIC Module” on page 55
”Installing an Optional Expansion or Stacking Module” on page 57
”Installing an Optional AT-RPS3004 Redundant Power Supply” on
page 60
”Cabling and Powering ON the Switch” on page 63
”Wiring a DC Powered Unit” on page 68
”Starting a Local Management Session” on page 71
”Warranty Registration” on page 74

Table of Contents

Related product manuals