Translated from the original language - English - 15Manual 6-1624970M - rev. 1 - 11/01/2023
Place the fixing plate respecting the measurements in the drawing to ensure the correct transmission of the movement on the rack.
Fill the concrete frame making sure that the plate remains on the surface.
Allow the cement to solidify for at least 24 hours.
Remove the counter frame.
Fill the soil around the concrete block.
Remove the washers and nuts above the fixing plate.
Insert the electrical cables into the pipes until they exit at least 500 mm.
16
97
24h
RACK