EasyManua.ls Logo

Alpha ESS SMILE5 - Page 80

Alpha ESS SMILE5
113 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
COMMISSIONING
78
Hybrid Mode
Three mode options: DC/AC/Hybrid
You can set the allowable feed-in ratio from 0%-100%.
Note:
When the safety standard is set as AS4777.2 (Australia and New
Zealand), the secondary sub-options can be selected according to
the region or local grid company.
On the grid side, if only a CT is installed, please select CT for grid
side.
If the grid meter is installed, please select Meter for grid side. If this
meter is a CT meter and the CT ratio is not 1, please select CT below
and input the Meter CT Ratio. If this meter is not a CT meter or the
Click “Submit” when the settings
are complete.
Storage PV capacity: PV capacity on the energy storage inverter side
Storage PV Capacity
5 kW
PV capacity on the PV-inverter (on-grid) side

Table of Contents

Other manuals for Alpha ESS SMILE5

Related product manuals