15
We reserve the right to modify technical specifications without prior notice.
UK830532/200610 © Alpha-InnoTec GmbH
Install air ow bafes…
CAUTION.
Remove the protective sheeting from the
air ow bafes before installation
•
Suspend air ow bafes on the brass bushings on
the top side of the frame…
1 eyelet on air ow bafe
2 brass bushing on frame
•
Bolt air ow bafes to the frame on the switch cab-
inet side (= operator side) and water connection
side…
Return top cover to frame…
Suspend upper facing panels in the top cover. Bolt
to the frame at bottom…
The air ow bafes are now installed. You can now
carry out mounting and installation work on the
unit, and afterwards attach the lower facing panels.
(see “Electrical connection work”, “Heat pump side
connection of control and sensor wires”) )…
CAUTION.
During extended interruptions in work,
close the unit with the lower facing panels.