13
Subject to technical amendments without prior notice | 83055800cUK – Translation of the operating manual | ait-deutschland GmbH
ConrmtheIBN–assistantormakethesettingvia:
Service>>Settings>>Energye󰀩cient
circulation pump:
The“Setoverowvalve”menuitemissetbydefaultto
“No”.Theoverowvalveadjustmentfunctionisdeac-
tivated.
The UWP control signal is the indication of the
currently required pump capacity as a %
Theactualowrateisthecurrentowrate(meas-
uring accuracy +/- 200 l/h)
1. Fully open the overow valve, close the heating
circuits.
2. If the “Set overow valve”menuitemissetfrom
“No” to “Yes”, the circulation pump is activated to
100% – and the pump starts up.
3. If the control signal UWP reaches 100%, close
theoverowvalvetotheextentthatthemaximum
owrate(seetechnicaldata)canbeensured.
Overowvalve(2)rotary-pushbutton(1)
4. Ifyouexitthe“Setoverowvalve”menuoratthe
latest after one hour, the circulation pump switch-
es back to standard regulation.
5. Open valves to heating circuit.
11 Commissioning
The relevant planning and design data of the system
is documented in full.
The relevant energy supply company has been
notiedoftheoperationoftheheatpumpsystem.
The system is air-free.
Installation check using the rough checklist has
been completed successfully.
1. Ensurethatthefollowingpointsarefullledcom-
pletely:
Clockwiserotatingeldispresentfortheload
supplyatthecompressor(for400Vconnec-
tion only).
The system is installed and mounted accord-
ing to this operation manual.
The electrical installation has been carried out
properly according to this operation manual
and the local regulations.
The power supply for the heat pump is
equipped with an all-pole circuit-breaker with
atleast3mmcontactspacing(IEC60947-2).
The tripping current is complied with.
Theheatingcircuithasbeenushedandvented.
All shut-o󰀨 devices of the heating circuit are
open.
The pipe systems and components of the sys-
tem are tight.
2. Carefully ll in and sign the notice of completion
for the heat pump systems.
3. In Germany and Austria: Send the notice of comple-
tion for heat pump systems and rough checklist to
the manufacturer’s factory customer service depart-
ment.
In other countries: Send the notice of completion
for heat pump systems and rough checklist to the
manufacturer’s local partner.
4. Arrange for the heat pump system to be com-
missioned by the manufacturer’s authorised after
sales service for a fee.