Loading and unloading the implement upon delivery
D9 BAH0041-4 08.18
35
3 Loading and unloading the implement upon delivery
The pictogram marks the location at which the
slings for lifting the implement with a crane is to
be secured.
Fig. 4
DANGER
Attach the slings for loading the
implement with a crane only at the
marked locations.
DANGER
Compliance with this information is essential for your safety:
Load the implement only when the hopper is empty
Please pay attention to the required tensile strength of the sling
Do not walk under suspended loads
Lash the implement down on the transport vehicle in accordance
with regulations.
Attach the seed drill to a crane hook for loading
and unloading with the seed box lid open.
Hang the crane hook in one of the two slots (Fig.
5/1) depending on the equipment and centre of
gravity of the seed drill.
The seed box must not be filled.
Fig. 5
DANGER
Do not exceed the max. transport height of 4.0 m.
Only transport the D9 4000 Super seed drill with the track markers
tilted to the side, (see section "Moving the track marker to the work-
ing/transport position", page 134).