Installation and Start-Up | 3-19
Connect the conductors that supply power and a ground source from
the Sample Probe to the appropriate terminals on the Temperature
Controller.
Connect the Sample Probe RTD wires to the appropriate terminals on
the Temperature Controller.
3. Complete the wiring from the analyzer to the Terminal Block in the
Probe Heater Junction Box (see Figure 3-3).
Tighten the screws to secure each wire to the appropriate Terminal
Block location in the Junction Box.
The procedure is complete.