EasyManua.ls Logo

Apeks 2000PSI THE DUPLEX - Appendix A - Belt Tension Testing;Adjustment; Appendix B - Diaphragm Pump Priming; Appendix C - Check Valve Cleaning

Apeks 2000PSI THE DUPLEX
43 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Apeks Supercritical The DuplexOperation Manual
36
Revision Date 8/28/2018
Appendix C.
Check Valve Cleaning
a) Remove the inlet and outlet tubing from the head of the compressor
b) Remove the seven bolts on each check valve retainer
c) Remove retainer and checks
d) Dissemble check and clean thoroughly with alcohol or acetone. For heavily soiled valves us an
ultrasonic cleaner on metal pieces to help remove soil. Do not clean the poppet (brown donut) in the
ultrasonic cleaner. If poppet is beyond cleaning or damaged contact Apeks for a replacement.
Check Valve
Retaining Bolts