EasyManua.ls Logo

Aqua HC151+ MULTI - Getting Started: Priming

Default Icon
36 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
HC151+
MULTI / HC200+
MULTI
ENGLISH
3.4 GETTING STARTED
3.4.1 Priming
Once the basic parameters of the pump have been set, it is suggested to carry out the priming: this
operation is used to "prime" the metering pump (i.e. fill the chamber between the membrane and the
pump body and remove any air bubbles present inside the suction and discharge tubes) and make it
ready to dose the chemical in the plant.
Before proceeding with priming, make sure you have connected the delivery and suction tubes to the
pump body as well as the air purge tube included in the supply (for the connection, follow the image
shown below:
For priming, follow the steps below:

Related product manuals