EasyManuals Logo

Atag Q 25S User Manual

Atag Q 25S
48 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #5 background imageLoading...
Page #5 background image
Installation & Servicing Instructions ATAG Q-Series
5
Installers are required to carry out installation, commissioning and servicing work in
accordance with the Benchmark Code of Practice which is available from the Heating
and Hotwater Industry Council who manage and promote the Scheme.
Visit www.centralheating.co.uk for more information.
Ireland:
- Irish standard 813
- Domestic gas installations
The current, Electricity at Work Regulation must be complied with and also be in
accordance with the relevant and current editions of the British Standards.
The ATAG Q boiler is a certied appliance and must not be modied or installed in
any way contrary to this Installation Manual. Manufacturers instructions must not be
taken in any way as overriding statutory obligations.
The ATAG Q is a central heating unit with an optional integrated hot water function.
These units must be connected according to these instructions and all installation
norms in respect of the part of the unit to be connected.
Observe the following rules of safety:
- All work on the unit must take place in a dry environment.
- ATAG units may never be in operation without their housing, except in connection
with maintenance or adjustments (see Chapter 13 and 14).
- Never allow electrical or electronic components to come into contact with water.
Carry out the following tasks in connection with maintenance, etc. to an already-
installed unit:
- Shut down all programmes
- Close the gas tap
- Remove the plug from the wall socket
- Close the stop cock of the unit’s intake connection
Take note of the following when maintenance or adjustments are needed:
- The unit must be able to function during these activities; for this reason, the unit’s
supply voltage, gas pressure and water pressure must be maintained. Ensure that
these is not a source of potential danger during these activities.
Following maintenance or other activities; always check the installation of all
parts through which gas ows (using leak-search spray).
Following maintenance or other activities, always replace the housing and
secure it with the screw behind the door at the front of the casing.
The following (safety) symbols may be encountered in these installation instructions
and on the unit:
This symbol indicates that the unit must be stored away from frost.
This symbol indicates that the packaging and/or contents can be damaged as
a result of insufcient care taken during transport.
This symbol indicates that, whilst still in its packaging, the unit must be
protected from weather conditions during transport and storage.
KEY-symbol. This symbol indicates that assembly or dismantling, must be
carried out.
ATTENTION symbol. This symbol indicates that extra attention must be paid
in connection with a particular operation.
Useful tip or advice

Other manuals for Atag Q 25S

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Atag Q 25S and is the answer not in the manual?

Atag Q 25S Specifications

General IconGeneral
BrandAtag
ModelQ 25S
CategoryBoiler
LanguageEnglish

Related product manuals