Starting up 
 
 
 
POWER UP 
1.  Make sure that all the necessary connections 
are in place. 
Electrical: such as power supply, inputs/outputs 
Pneumatic: including line pressure supply. 
 
2. Power up your device 
When power-up is completed, the Program screen 
is displayed, with last program used on screen. 
 
 
 
 
 
PREPARING A PROGRAM 
Use this procedure to configure a new test program. 
 
On the MAIN MENU screen: 
 
ACCESSING THE PARAMETERS 
 
1.   Select PARAMETERS using the up/down 
    keys and then press  . 
 
 
 
 
 
 
The program list is displayed. 
 
 
 
 
 
 
 
SELECTING A PROGRAM NUMBER 
 
2.   Select the program to configure and press   . 
 
A list of the available measurement types is displayed: 
 
— 
DIRECT FLOW type 
— 
INDIRECT type 
— 
OPERATOR type 
— 
QUICK TEST type.