Step Description Figure
8 Put the top cover back on, making sure the O-
ring is in place.
9 Finally tighten the M10 bolts, making sure
there are no leaks.
10 Repeat steps 2 to 9 for the other tower of the
dryer.
11 Follow the start-up procedure described in
section Operating instructions.
Instruction book
2920 7083 21 41