INSTALLATION
CHECKLIST
09
32
INSTALLATION CHECKLIST
This checklist is a summary of the main items that should be checked off as part of the installation
completion or when conducting an inspection. This list is not inclusive of related work that may be
performed in conjunction with an ATMOX system installation.
Add a check mark to the first column if task completed.
CHECK
MARK
SECTION INSTALLATION STEP PAGE
CONTROLLER AND DISPLAY
Controller and connected display installed and powered.
Neither of these is outside nor exposed to weather
elements.
15, 25
Setup or settings menu completed.
Components being used properly selected in menu.
23
26-31
POWER BOOSTER
If installed, Power Booster sync process completed. 24
Settings checked and testing completed after booster
install.
26-31
SENSORS
Sensors installed in correct locations.
No coupler connections outside.
Cables fastened to be out of the way.
15-16
Readings of temperature and relative humidity from both
inside and outside are on the display.
Readings seem reasonable and aren’t reversed.
4
If installed, wood moisture reading on the display. 5