EasyManua.ls Logo

AVANT CH100 - Mounting of the Chipper and Pre-Operation Inspections

AVANT CH100
48 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
16
CH100
MOUNTING OF THE CHIPPER AND PRE-OPERATION
INSPECTIONS
1. For mounting or dismounting the chipper, always
turn o the loader and apply the parking brake
before entering the area between chipper and
loader.
2. Make sure all protective and safety devices of the
chipper are installed. Never remove any protective
device during operation.
3. Before operation, please make sure there are no
foreign objects in the feed hopper.
4. Before operation, please make sure there are no
foreign objects in the chipper. Rotate the shaft to
make sure that the cutting disk can rotate freely
5. Make sure that the water drainage holes on the
lower chamber are open and that the disk is not
frozen up.
6. During operation, the chipper must stand on level
and hard ground.
7. Direct the discharge pipe so that the thrown out
chips do not pose a risk to the operator of the
chipper or to or anyone else. Always keep a safe
distance to the discharge position of the chips.