• Installing a single ERS 3510GT or ERS 3510GT-PWR+ switch in an equipment rack on
page 27
• Installing two ERS 3510GT or ERS 3510GT-PWR+ switches in an equipment rack on
page 29
Installing an ERS 3510GT or ERS 3510GT-PWR+ switch on a table or shelf
About this task
Install the switch models ERS 3510GT or ERS 3510GT-PWR+ on a flat surface such as a table or
shelf.
Before you begin
• Ensure the surface supports the combined weight of the switch and attached cables. Cable
weight varies for each installation.
• Allow at least 2 inches (5.1 cm) on each side of the switch for proper ventilation and at least 5
inches (12.7 cm) at the back of the switch for power cord clearance.
Procedure
1. Attach the rubber feet at the marked locations.
Switch installation
September 2016 Installing Avaya Ethernet Routing Switch 3500 Series 25
Comments on this document? infodev@avaya.com