EasyManuals Logo

Azbil 100 Series User Manual

Azbil 100 Series
80 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #5 background imageLoading...
Page #5 background image
iii
Unpacking
Handle the equipment with all due care to prevent any damage to prevent damage.
Verify that the following items are included:
Smart Valve Positioner 100 Series Model AVP100 (1) / AVP102(1)
Feedback lever (1) and hex socket bolt (2).
Hex wrench (1) for feedback
Pressure gauge (option)
Joint (option)
Manual (option)
Storage
When storing your SVP without its original packaging, store it indoors, at normal
temperature (25°C) and humidity (~65%) store it in a place free from vibration and shock
and not exposed to rain or water.
If you are storing your SVP after it has been used, clean the SVP thoroughly and then
firmly tighten the terminal box cover and seal the wiring, piping connections and bleed
hole on the pilot cover using Azbil Corporation-supplied caps or tape to prevent entry of
moisture.
Precautions for worker safety
Do not stand on the installed SVP or use it as a step.
Take utmost care not to in voluntarily touch the SVP while it is in operation. Its surface
may be very hot or very cold, depending on the operating environment.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Azbil 100 Series and is the answer not in the manual?

Azbil 100 Series Specifications

General IconGeneral
BrandAzbil
Model100 Series
CategoryValve Positioners
LanguageEnglish

Related product manuals