5
Test Procedure
42
DHV0078 b2 EN
© b2 electronic GmbH
Step
Procedure
(configure automatic sequence)
Example
AS13
(vacuum bottle only)
Rise rate
Set the test “Rise” rate:
Min. = 0.5 kV/s
Max. = 5.0 kV/s
AS14:
Save sequence
Test sequence setup is complete.
To save the program, select “SAVE”.
The program will be stored under a name referring to
its test parameters. (To modify name, see AS15.)
The sequence is found in the “Edit Auto Test Seq.
menu display. See Step AS1.
AS15:
(optional)
Edit sequence title
To modify the sequence title from program already
saved in HVA memory, highlight the corresponding
sequence from the “Edit Auto Test Seq.menu display.
select the “EDIT” option on the bottom of the screen
select the “TITLE” option on the bottom of
the screen
For naming directions, see 6Reporting Procedure
Report Naming Instructions
New Auto Test Seq.
60.0kV Vacuum Bottle
Maintenance
Test Voltage 1.0kV
Duration: 1min 0sec
Rise Rate?
0.5kV/ s
CANCEL PREV NEXT
New Auto Test Seq.
1.0 kV Cable XPLE
Maintenance/Sine0.1Hz
Test Voltage: 1.0kVrms
Duration: 15 min
Trip out on Arc
Finished
Save or Cancel
CANCEL PREV SAVE
Edit Auto Test Seq.
3.0kV Maint. C. HYBR (T)
BACK SELECT EDIT DEL NEW
Edit Parameters.
1.0 kV Cable XPLE
Maintenance Test Seq.
1 Step / Test Setup
Test Voltage: 1.0kVrms
Duration: 15 min
Wave: Sine 0.1/Auto
Trip out on Arc
CANCEL SAVE TITLE
Auto Test Seq. Title
Edit Title
1.0kV Cable
CANCEL SAVE