3
Unit Weights
Beforerigginganyunit,theweightofeachsectionshouldbeveriedfromtheunitcertied
drawing.Unitprintweightsincludethenalassembledunitwithallaccessories.Accessory
weights(foundontherespectivedrawing)canbedeductedfromthetotalweight.
Anchoring
Seven-eighthsinch(7/8”)diameterholesareprovidedinthebottomangeofthebasin
sectionforboltingtheunittothesupportbeams.Refertothesuggestedsupportdrawing
includedinthesubmittalforlocationandquantityofthemountingholes.The unit must
be level for proper operation.Anchorboltsmustbeprovidedbyothers.TheIBCratingis
onlycertiedwithstandardanchoragelocations.Usingalternateanchoragelocationsor
alternatesteelsupportswillvoidanyIBCwindorseismicratings.ContactyourlocalBAC
Representativefordetails.
Cold Weather Operation
Theseproductsmustbeprotectedbymechanicalandoperationalmethodsagainstdamage
and/orreducedeffectivenesswheneveraunitisoperatedinbelowfreezingambient
conditions.PleaserefertotheCrossflow Coil Product Operation and Maintenance Manual
onwww.BaltimoreAircoil.com,orcontactyourlocalBACRepresentativeforrecommended
coldweatheroperationstrategies.
Location
Allevaporativecoolingequipmentmustbelocatedtoensureanadequatesupplyoffresh
airtotheunitairintakes.Whenunitsarelocatedadjacenttowallsorinenclosures,
caremustbetakentoensurethewarm,saturated,dischargeairisnotdeectedand
recirculatedbacktotheairintakes.
Eachunitshouldbelocatedandpositionedtopreventtheintroductionofdischarge
airintotheventilationsystemofanybuilding.FordetailedrecommendationsonBAC
equipmentlayout,seeourwebsiteatwww.BaltimoreAircoil.comorcontactyourlocalBAC
Representative.
Warranties
PleaserefertotheLimitationofWarranties(locatedinthesubmittalpackage)applicableto
andineffectatthetimeofthesale/purchaseoftheseproducts.
Unit Operation
Priortostart-upandunitoperation,refertotheCrossflow Coil Product Operation &
Maintenance Manual shippedwiththeunitandalsoavailableatwww.BaltimoreAircoil.com
Introduction
Safety
Shipping
Pre-Rigging Checks
Unit Weights
Anchoring
Cold Weather Operation
Location
Warranties
ATTENTION: Before an actual lift
is undertaken, ensure no water,
snow, ice, or debris has collected
in the basin or elsewhere in the
unit. Such accumulations will add
substantially to the equipment’s
lifting weight.
NOTE: Each unit must be located
and positioned to prevent the
introduction of discharge air
into the ventilation systems of
the building on which the unit is
located and of adjacent buildings.