WWW.BALTIMOREAIRCOIL.COM
5
Unit Rigging & Assembly
Rigging
Section Assembly of Two-Piece
Cells
Two-Piece Cell Assembly Instructions:
1. Removeanyaccessoriesshippedinthecoldwaterbasin.
2. Positionthelowersectionontheunitsupportsandboltinplace.
3. Wipeanymoistureanddirtfromtheperimetermatingangesofthelowersection.
4. Afterthelowersectionoftheunitisinplace,retracttheliftingears(whereapplicable)
insidetheunittoavoidinterferencewhentheuppersectionoftheunitispositioned
asillustratedinFigure 2.
5. Installatbutylsealertape(BACpart#554000)suppliedwiththeunit,as
illustratedinFigure 3,onthematingangesofthelowersectioninacontinuousline.
Ateachcorner,allow1”overlap.
6. Beforeloweringtheuppersectionontothelowersection,besuretolineupthebolt
holesusingdriftpinsasillustratedinFigure 4(nofewerthanoneholeateachedge).
Guidetheuppersectionontothelowersectionstartingwithaboltholeatone
cornerandfollowingdowntheange.
7. Securetheuppersectioninplaceusingboltssuppliedwiththeunittoensureleak-
freeoperation(Figure 5).
NOTE: All piping must be restrained
to ensure no vertical or horizontal
movement. All piping and supports
are to be furnished by others.
Piping must be independently
supported, not from the unit. Refer
to the certified drawing for details
on the connection size, etc.
NOTE: IBC Rating is void if section
assembly is not performed as
described in this manual.
Figure 4. Drift Pin Alignment
Figure 3. Assembly of Two-Piece Unit
Figure 5. Typical Bolting
Figure 2. Lifting Ears
LiftingEarsin
RaisedPosition
LiftingEar
Retracted
3/8”Bolt
FlatButyl
Sealer
Tape
Lock
Washer,
Flatwasher
andNut
Flatwasher
Figure 1b. Upper Section Lift
.