EasyManua.ls Logo

Badger Meter PC200 - Page 10

Badger Meter PC200
36 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Figure 2: Enclosure dimensions
Figure 3: Grounding location, top view
MPORTANTI
Installations must have a reliable ground connection for the sensor and the metal casing.
Installations must have an effective screened cable for the input signal and grounding of its screen to the ground terminal or at the
sensor itself, whichever is appropriate to the application.
Figure 4: Grounding location, bottom view
Industrial Process Controller, Model PC200
Page 10 April 2017CTL-UM-00483-EN-07

Related product manuals