EasyManua.ls Logo

Bauer Mini Verticus - Removing the IK120 II C & G, 2 Nd Stage Valves

Bauer Mini Verticus
138 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
G 120 II V
Page 24 1st Edition, Rev. 0 Chg. 2
3.1.8.4 Removing the IK120 II C & G, 2nd Stage Valves.
See Figure 3-12 and proceed as follows:
1. Remove the intake and pressure lines from the Valve Head (7).
2. Remove the screws (8) holding the Valve Head onto the cylinder.
3. Insert two 8 mm diameter metal pins, any length, in the holes in the Valve Head and secure them in
a vise with the valve head on top.
4. Using the special valve tool, remove the Intake Valve (6) (See Figure 3-13).
5. Turn the Valve Head over and replace it on the metal pins.
6. Remove the Cap Nut (1).
7. Unscrew the Stud (2) approximately five turns.
Figure 3-12 IK120 II C & G, 2nd Stage Valve Head and Valves
1. Cap Nut
2. Stud
3. Pressure Plug
4. O-ring
5. Pressure Valve Insert
6. Intake Valve
7. 2nd Stage Valve Head
8. Allen Screw
^ CAUTION
In order to avoid damaging the special tool or the valve when using the tool, ensure that it is pushed prop-
erly and firmly into the valve bore so that it will not tilt when it is turned.
1
2
3
4
5
6
7
8

Table of Contents

Related product manuals