Installation checklist
Operating Instructions Safety I/O Terminals SI4000 / SO4000
Dokument-Nr.: 5.08009.05 Baumüller Nürnberg GmbH
68
of 82
C.1
1.8 Has a visual inspection of the installed com-
ponents been conducted?
1.9 Have the required installation spacings to
other components been complied with?
1.10 Do the components meet the environmental
conditions prevailing in the application?
1.11 Does the system fulfil the required type of
protection?
1.12 Is degree of pollution 2 complied with?
1.13 Is the system protected against corrosive
substances?
Date Name Signature
Serial
no.
Requirement Fulfilled Remarks
Yes No