8.3 Checklist after commissioning
A few days after the appliance is commissioned, check the installation.
1. Check the tightness of the connections.
2. Check the water pressure.
3. Check that there are no errors on the control panel.
4. Inform the user of the frequency of maintenance work to be carried
out.
5. Explain how the system and control panel work to the users.
6. Hand over all manuals to the user.
Fig.48
MW-4000183-2
8 Commissioning
7740327 - v03 - 03122019 45