Preventive Maintenance 23
SIGMA Spectrum Infusion System Pump Operating Software Version 6.02 and 6.05
Preventive Maintenance For Use With MDL Version 6
6. Air Detection Test
Pass criteria:
All steps completed successfully.
Pump goes into Air in Line alarm.
(Rate = 100 mL/hr VTBI = 50 mL)
7. Battery Capacity Test
Perform the Battery Capacity Test to determine the storage capacity of the
battery.
NOTE: Test time approximately 9 hours.
Start Time Date: ____________
Time “Start to dead” = ______Hrs. ______Min.
End Time Date: _____________
Pass criteria
Standard Battery
■ Used: ≥6 hours from “Start to dead”
■ New: ≥8 hours from “Start to dead”
Wireless Battery
■ Used: ≥3 hours from “Start to dead”
■ New: ≥4 hours from “Start to dead”
Start Time Date: ____________
Time “Low to dead” = ______Hrs. ______Min.
End Time Date: _____________
Pass criteria
Standard Battery
■ Used: ≥31 minutes from “Low to dead”
■ New: ≥31 minutes from “Low to dead”
Wireless Battery
■ Used: ≥31 minutes from “Low to dead”
■ New: ≥31 minutes from “Low to dead”
Tests Performed Pass Fail