EasyManua.ls Logo

BEHA Unitest Hexagon 310 - Continuity Test

BEHA Unitest Hexagon 310
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
58
5.6 Continuity Test
Prior to any continuity test, it
must be ensured that the resi-
stance to be measured is not
live. Failure to comply with
this prescription can lead to
dangerous corporal user inju-
ries or cause instrument
damage. Additionally, foreign
voltages falsify the measure-
ment result.
Position measurement function
selection switch to /
measurement range.
Connect the black test lead to
the COM socket and the red
test lead to the Temp/
/ / socket.
The resistance measurement
range is pre-set. Select the
desired measurement function
by pressing key . The
symbol is displayed on the dis-
play screen.
Connect test leads to UUT.
The measurement result is
indicated; optical display on the
screen, acoustic indication by
signal sound.
Continuity Test

Table of Contents