EasyManua.ls Logo

Beissbarth BAC 5100yf - Install The Oil Drain Bottle; Power Up The Machine; Language Selection; Units Of Measure

Beissbarth BAC 5100yf
51 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
11
BAC 5100yf Rev. A
Install the Oil Drain Bottle
1.Holdtheoildrainbottlestraight,andinsertthe
connectorintotheholeuntilitsnapsintoplace.See
Figure2.
Power Up the Machine
1.Unwindthepowercordfromthehandle,andplugit
intoacorrectvoltage,groundedoutlet.
2.Positionthemachinesotheplugandthemain
powerswitchareofeasyaccessfortheoperator.
Verifythefanventsontherearofthemachineare
notobstructed.
3.Lockthefrontwheels.
4.TurntheLockout/TagOutleverclockwise(CW)to
switchitON.
5.TurnONthemainpowerswitch.
Thersttimethemachineispoweredup,itdisplays
thelicenseagreementforyourapprovalandthen
launchesintotheinitial
Setup
mode.
Language Selection
Theoperatorselectsthelanguageforthescreen
promptdisplays.Englishisthedefaultlanguage.
1.
UsetheUPorDOWNarrowkeytotogglethroughthe
availablelanguages.
2.
PressOKtosettheselectedlanguage.
Unit of Measure
Theoperatorsetsthedisplayforunitsofmeasure.
Metricisthedefault.
1.UsetheUPorDOWNarrowkeytotogglekilograms
orpounds.
2.
PressOK tochoosethedisplayedunitofmeasure.
Setup
CAUTION: The machine is
programmed to run the setup
procedure as outlined here. To prevent
personal injury, do NOT operate the
machine without the oil ll port plug
installed, because the vacuum pump is
pressurized during normal operation.
Figure 2
Oil Drain
Bottle