HD-9 Series Four-Post Lifts 34 P/N 5900123 — Rev. N2 — November 2023
7,094
8,332
Important: Make sure to use the correct Lifting Cable for each routing. If you install a Cable in the
wrong place, it will be too short or too long. Remember that the length of each Cable
is printed on the label on the Threaded end.
• Lifting Cables, A and B pass around one Cable Sheave and one Gusset Sheave. Lifting Cables C
and D pass around two Cable Sheaves and one Gusset Sheave.
See the drawing on the following page for routing information.