HD-9 Series Four-Post Lifts 20 P/N 5900123 — Rev. M — February 2020
Unloading and Unpacking
Once the components are unloaded, they are your responsibility to move around. As the Lift includes a
number of heavy pieces, the closer you unload them to the installation location, the better off you are.
⚠ CAUTION Some Lift components are very heavy; if handled incorrectly, they can damage
materials like tile, sandstone, and brick. Try to handle the Lift components twice:
once when delivered and once when moved into position. You must have a Forklift
or Shop Crane to move them into position. Use care when moving them.
⚠ WARNING The Posts and Runways are delivered with stabilizing structures on each end. Be
very careful when removing these stabilizing structures; the Posts and Runways
can shift or even fall. If they fall on a person, they could cause serious injury.
Moving the Posts into Position
Use a Forklift or Shop Crane to move the Posts, one at a time, to the inside corners of the Chalk Line
Guides.
Important: Position the Power Post at your chosen location. Remember, the Power Post can only
go in two possible locations: the
Front Driver-Side
or the
Rear Passenger-Side
.
The other three Posts can go at any of the remaining Post locations. Refer to
Selecting the Lift Orientation for more information.
Do not stand up the Posts yet
; some of the following procedures are easier to complete if the
Posts are laying on the ground.