EasyManua.ls Logo

BendPak HDS-14X - Step 18; Bleeding

BendPak HDS-14X
56 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
29
STEP 18
(Bleeding)
1. Lift must be fully lowered before changing or adding
uid.
2. Raise and lower lift six times. The Cylinder is self-
bleeding. After bleeding system, uid level in power unit
reservoir may be down. Add more uid if necessary to
raise lift to full height. It is only necessary to add uid to
Raise lift to full height.
3. To pressure test, run lift to full rise and run motor
for approximately 3-seconds after lift stops. This will put
pressure on the hydraulic system. Stop and check all t-
tings and hose connections. Tighten or reseal if required.
POST-INSTALLATION CHECK-OFF
n Columns properly shimmed and stable
n Anchor Bolts tightened
n Pivot / Sheave Pins properly attached
n Electric power supply confirmed
n Cables adjusted properly
n Safety Locks functioning properly
n Check for hydraulic leaks
n Oil level
n Lubrication of critical components
n Check for overhead obstructions
n All Screws, Bolts, and Pins securely fastened
n Surrounding area clean
n Operation, Maintenance and Safety Manuals
on site.
n Perform an Operational Test with a typical vehicle

Other manuals for BendPak HDS-14X

Related product manuals