EasyManua.ls Logo

BendPak xpR-10C-168 - Step 4; Site Layout

BendPak xpR-10C-168
76 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
1313
STEP 4
(Site Layout)
1. Determine which side will be the approach side.
2. Now determine where the Power Unit will be located.
The POWERSIDE column has the power-unit mounting
bracket attached to the side.
3. Once a location is determined, use a carpenters chalk
line to layout a grid for the Post locations. Keep all
dimensions and squareness within 1/8” or malfunctioning of
the lift can occur. (See page 11)
4. After the Post locations are properly marked, use a
chalk or crayon to make an outline of the Posts on the floor
at each location using the Post Base Plates as a template.
(See Fig 4.1)
5. Double check all dimensions and make sure that the
layout is perfectly square.
Fig 4.1.

Related product manuals