EasyManuals Logo

BendPak XPR-9FD User Manual

Default Icon
48 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #9 background imageLoading...
Page #9 background image
9
STEP 3
( Column Preparation )
COMPLETE THE FOLLOWING
PRIOR TO STANDING UP COLUMNS.
1. Lay the Columns on the floor, slide the Carriage up
towards to the top of the Columns just enough to gain access
to the Port on the base of the Cylinder. (See Figs. 3.1)
2. Install the Straight 1.4” Straight Fitting into the Cylinder
port using Teflon tape on the pipe threads. DO NOT use
Teflon Tape of the JIC hose Fittings. (See Fig. 3.2)
3. Remove Pins, Bottom Sheave Covers, and Sheaves to
aid in the routing of the Equalizer Cables.
4. Route Button End of Cable up through Carriage and clip
into retaining slot. (See Fig. 3.)
5. Route Threaded end over Sheave (pulley) in the Base
plate and reinstall the Sheave and Sheave Cover, and Pin.
(See Fig. 3.4)
6. Coil Cable and tie or wire to the Carriage. The Threaded
End will be routed to the opposite Columns after the Columns
are stood up.
Fig 3.1
Fig 3.2
Fig 3.3
Fig 3.4

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the BendPak XPR-9FD and is the answer not in the manual?

BendPak XPR-9FD Specifications

General IconGeneral
BrandBendPak
ModelXPR-9FD
CategoryLifting Systems
LanguageEnglish

Related product manuals