EasyManua.ls Logo

Binder BF 720 - 3.4 Installation Location and Ambient Conditions

Default Icon
117 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
BD / BF / ED / FD / FED (E3.1) 02/2022 page 19/116
CAUTION
Risk of injury and damages by lifting heavy loads and by sliding or tilting of the
chamber due to improper transportation.
Injuries, damage to the chamber.
Transport the chamber only in its original packaging.
Secure the chamber with transport straps for transport.
Do NOT lift or transport the chamber using the door handle or the door.
Do NOT lift chambers size 720 by hand
Lift chamber size 56 and 115 at its four lower corners with the aid of 2 people, cham-
ber size 260 with the aid of 4 people, and place it on a transport pallet with wheels.
Push the pallet to the desired site and then lift the chamber from the pallet at its four
lower corners.
Place chamber size 720 using technical devices (fork lifter) on the transport pallet.
Set the fork lifter only from the rear in the middle of the chamber. Make sure to place
all the lateral supports of the chamber on the forks.
Transport chamber size 720 ONLY with the original transport pallet. Set the fork lifter
only to the pallet. Without the pallet the chamber is in imminent danger of overturn-
ing!
Permissible ambient temperature range during transport: -10 °C to +60 °C / 14 °F to 140 °F.
You can order transport packing and pallets for transportation purposes from BINDER Service.
3.3 Storage
Intermediate storage of the chamber is possible in a closed and dry room. Observe the guidelines for tem-
porary decommissioning (chap. 15.2).
Permissible ambient temperature range during storage: -10 °C to +60 °C / 14 °F to 140 °F.
Permissible ambient humidity: max. 70 % r.H., non-condensing
When after storage in a cold location you transfer the chamber to its warmer installation site, condensation
may form. Before start-up, wait at least one hour until the chamber has attained ambient temperature and
is completely dry.
3.4 Location of installation and ambient conditions
Set up the chamber on an even and non-flammable surface, free from vibration and in a well-ventilated,
dry location and align it using a spirit level. The site of installation must be capable of supporting the cham-
ber’s weight (see technical data, chap. 16.4 to 16.7). The chambers are designed for setting up inside a
building (indoor use).
NOTICE
Danger of overheating due to lack of ventilation.
Damage to the chamber.
Do NOT install the chamber in unventilated recesses.
Ensure sufficient ventilation for dispersal of the heat.
Observe the prescribed minimum distances when installing the chamber.

Table of Contents

Other manuals for Binder BF 720

Related product manuals