ANTSPACE HK3 Water cooling container & Dry-Wet Tower Product Manual
30
Figure 7-9 System pipeline connection ball valve
a) Use an air compressor to pressurize to 7 bar and stabilize for more than 12 hours, and check for
any leakage points.
b) The key inspection.
The key inspection areas are as follows:
a) The connection between the quick connector and the mini ball valve.
b) The connection between the quick connection ball valve and corrugated pipes.
c) The connection between the mini ball valve and the water distributor.
d) The connection between the quick connector and computing power server.
e) Each flange/chuck/threaded/welded connection.
Figure 7-10 System chuck connection