Figure 7-11 System leakage point inspection
The inspection method is as follows:
• Check for leaks by seeing, listening and touching.
• Add water to one of soap, laundry detergent, and detergent to make soap solution, and apply it to suspected
leakage points, especially at the joints. The areas with bubbles and bulges are the leakage points.
7.3 System Water Replenishment
During the installation of the external pipeline, it is necessary to check whether the filter Z01 in the external
pipeline 06 is intact.
The spray water inside the cooling tower adopts tap water or softened water, and a tap water pipe (DN40) is
installed on site. It is recommended to choose appropriate antifreeze or purified water based on local climate
conditions as the circulating media in cooling tower and container.
Firstly, add Water to the system with a Water filling pump. When the return pressure reaches the required
value, stop adding Water to the system. Switch the pipeline switch, and start the Water filling pump to add Water
to the water tank. When the Water level in the water tank reaches the required height, switch the pipeline switch,
and the system will automatically run.
The specific Water filling procedure is as follows:
a) Preparation: Prepare materials and tools, and open all exhaust valves of the system (open the manual exhaust
valve of the system and the manual exhaust valve on the cooling tower for the first Water filling).
b) System Water replenishment: Replenish the system with Water filling pump P11.