Lift Tables
PLANNED MAINTENANCE PROGRAM - PMP CHECKLIST
Customer: SWO#
Location: Date:
Contact: Telephone: Inspected By:
Signature: Model / Serial #: Voltage: Phase: HP:
DEALER:
Mark the following with one of the following:
= GOOD
r = COMMENTS / REQUIRES REPAIR
Position # Position # Position # Position # Position #
r r r r r
Mount area
Wire harness / cables
Hydraulic hose assembly
Cylinder(s)
Structural damage
Electrical connectors
Lowering speed flow control (If present)
Leg rollers
Scissor pin bushings *
Lift Maintenance Strut
Check that operational placard present and legible
Complete operating cycle by checking lights for
proper sequence, both inside and outside if so
equipped
Unit Certified for
Maximum Lift Capacity
Position #
Comments (for items marked with an r):
The noted equipment has been checked, inspected and serviced by a trained technician.
NOTE TO TECHNICIAN:
ALL ITEMS ON LIST MUST BE VERIFIED
AND CHECKED. ITEMS WITH AN * REQUIRE
LUBRICATION.
Position # Position # Position # Position # Position #
Barricade area
Disconnect power per OSHA requirements
Clean debris from in and around lift table
WARNING
IN-PLANT LFT LIFT TABLE — OWNER'S MANUAL
18 ISSUE DATE: NOVEMBER 15, 2023 REV. 1.0 (PART # 038-475E)