Bosch IDS BOVA Installation Instructions
12.2016 | Bosch Thermotechnology Corp.Data subject to change
3 Unit preparation
3.1 Prepare the unit for installation
STEP 1 - Check for damage and report promptly to the carrier any damage
found to the unit (Fig. 6).
The charge port can be used to check to be sure the refrigerant charge has
been retained during shipment.
Figure 6
4 Setting the unit
4.1 Pad installation
When installing the unit on a support pad, such as a concrete slab, consider the
following:
The pad must be at least 1-2” larger than the unit on all sides.
The pad must be separate from any structure.
The pad must be level.
The pad must be high enough above grade to allow for drainage.
The pad location must comply with National, State, and Local codes.
These instructions are intended to provide a method to tie-down system to
cement slab as a securing procedure for high wind areas. Check Local
Codes for tie-down methods and protocols.
Figure 7
#7 X 3/8” Self Tapping Screws
(Don’t Exceed 3/8” long)
Detail A
The dimension
see Unit Dimensions.
See Detail A
Brackets:
2" width, 1/16" thickness,
height as required.
Available from distributor
or in market place.
1/4” Χ 1-1/2” Hex Washer Head Concrete Screws
(3/16” Pilot Hole Needed. Pilot Hole Should Be1/4” Deeper
Than The Fastener Embedment)
Figure 8