Regulations
Condens 7000 WP – 6721842519 (2022/03)
10
2.13 Opening and closing the front panel of the appliance
The boiler has a rotary lock.
▶ Use the designated tool when opening and closing the front panel
(ideally a flat-bladed screwdriver).
Opening the front panel
▶ Turn the locking screw a quarter turn [1].
▶ Tilt the front cover forwards and remove [2 + 3].
Closing the front panel
▶ Insert the locating pins on the front cover into the centring holes [4]
in the frame.
▶ Squeeze the front cover shut at the position of the locking screw.
Fig. 6 Opening the front panel
3Regulations
DANGER
Failure to comply with instructions may result in material damage
and personal injury, including danger to life!
▶ Comply with all instructions.
NOTICE
System damage due to differing operating conditions!
Faults may arise when deviating from the specified operating operating
conditions. Individual components or the boiler may be destroyed if
there are deviations.
▶ Observe the binding information on the data plate.
3.1 Notes on installation and operation
Use only genuine spare parts from the manufacturer. The manufacturer
can assume no liability for damage caused by spare parts not supplied by
the manufacturer.
When installing and operating the heating system, observe the following
requirements:
• The local building regulations regarding installation conditions.
• The local building regulations regarding the supply and exhaust air
systems, and the chimney connection.
• Latest edition of the IEE Wiring regulations governing electrical
connection to the mains power supply
• Regulations and standards regarding the safety equipment in water-
filled heating systems. For guidance see the ICOM water treatment
guide for commercial heating systems.
• Make sure that the regional approvals required for the flue system
and condensate connection to the public sewage system have been
obtained.
3.2 Regulations
In order to ensure installation and operation of the product in
accordance with the regulations, please observe all the applicable
national and regional regulations as well as all technical rules and
guidelines.
The document 6720807972 contains information about the applicable
regulations. You can use the document search on our website to display
this. You will find the address of the website on the back of these
instructions.
4Flue gas routing
A supplement for flue gas routing is included with this product. This
document describes the flue gas accessories, flue gas classifications
and corresponding flue lengths.
▶ Install the flue system as described in the supplied documentation.
5 Preconditions for installation
DANGER
Danger to life from explosion!
An increased and permanent ammonia concentration may lead to stress
corrosion cracking on brass (e.g.gas valves, union nuts). As a result,
there is a risk of explosion from gas escaping.
▶Do not use wall mounted gas boilers in rooms where there is an
increased or permanent ammoniac concentration (e.g. livestock
stables or storage room for fertilisers).
▶ If contact with ammonia is unavoidable, make sure that there are no
brass parts installed in the system.
0010030538-001
1.
3.
2.
4