EasyManua.ls Logo

Bosch Condens 7000 WP - Resetting the Maintenance Type; Measuring the Gas Pressure; Measuring of CO and CO2; Measuring the Ionisation Current

Bosch Condens 7000 WP
52 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Inspection and maintenance
Condens 7000 WP – 6721842519 (2022/03)
36
10.10 Resetting the Maintenance type
Resetting the set Maintenance type starts the new maintenance interval.
Open the menu Reset ( table 13, p. 31).
Reset the parameter Service display.
10.11 Measuring the gas pressure
Measure the gas working pressure ( § 8.5, p. 22).
Make a note of the value in the maintenance protocol ( § 16.6, p.
49).
10.12 Measuring of CO and CO
2
Measure the CO content and the CO
2
percentage ( § 8.6, p. 22).
Make a note of the values in the maintenance protocol ( § 16.6, p.
49).
10.13 Measuring the ionisation current
Read off the ionisation current on the display ( § 8.8, p. 23).
Make a note of the value in the maintenance protocol ( § 10.17, p.
38).
-or-
If the value is less than 2 A: replace the ignition and flame sense
electrode ( § 10.16.2, p. 36).
10.14 Check the (flue) gas tightness
Check the tightness of all gas-carrying components ( § 8.9, p.
23).
Visually inspect the supply air and flue gas routing and check for
tightness and correct installation/brackets.
Check whether the siphon is filled with water and fill if required ( §
10.7, p. 34).
10.15 Check for correct operation
Check the tightness of all couplings.
Check the operating pressure and top up if required.
In doing so, take the water quality into consideration ( § 5.3, p.
11).
Check the settings of the boiler ( § 9.4, p. 25).
Complete the inspection and maintenance protocol ( § 10.17, p.
38).
Close the front panel.
10.16 Replacing components
10.16.1 Replacement interval for components
The following components must be replaced after expiry of the specified
service life.
Table 19 Replacement interval for each component
Document replacement of components in the maintenance
protocol( § 10.17, p. 38).
10.16.2 Replacement of the ionisation and ignition electrode
NOTICE
Damage to the appliance by applying an excessively high torque
when tightening the screws.
The screws of the ionisation and ignition electrode are installed in an
aluminium heat exchanger. Using a graphite seal ensures tightness when
tightening the screws hand-tight (using hand tools).
Tighten the 4 screws of the ionisation and ignition electrode by hand
(3Nm).
Observe the replacement period for the ionisation and ignition
electrode.
Replace the ionisation and firing pin according to the service life (
Tab. 19, p. 36).
Switch off the appliance.
Undo the screws [1] of the ionisation and ignition electrode.
Remove the ionisation and ignition electrode [2 + 3].
Remove the plug of the ionisation and ignition electrode.
Remove both gaskets [4].
Fig. 44 Replacement of the ionisation and ignition electrode
[1] Screws
[2] Ionisation electrode
[3] Ignition electrode
[4] Gasket
Clean the contact surface on the heat exchanger.
Fit the new gasket and the new ionisation and ignition electrode.
Tighten the screws of the ionisation and ignition electrode (3 Nm).
Install the plug of the ionisation and ignition electrode.
Start up the boiler.
Check the flue gas tightness of the removed parts.
Replace according to specification, depending on what occurs
first.
Service life Burner
runtime
Burner starts
Component [Year] [Hours] [Number]
Gaskets and O-rings Remove gaskets and always replace O-rings.
Ionisation and ignition
electrode
2 4000 25,000
Burner gasket 2 4000 --
Gasket of condensate
catch pan
2 4000 --
Flue gas check valve
1)
1) Use only with cascade system.
2 4000 --
Air/gas ratio control
valve
10 -- 500,000
Gas hose 10 20,000 --
2)
2) When replacing the air/gas ratio control valve it is advisable also to replace the
gas hose.
0010040027-001
3 Nm
4
2
4
3
1
1

Table of Contents

Other manuals for Bosch Condens 7000 WP

Related product manuals