1 689 975 254 2014-01-14| Robert Bosch GmbH
22 | CRR 120 | CRR 120 designen
5.2 Pneumatic system diagram
Fig. 4: CRR 120 pneumatic system diagram
A Pressure connection P1/P2 (outlet)
A1 Display module (voltmeter)
B Pressure connection Po
PIn Pressure connection (inlet)
ED02 Pressure control valve
Po Mechanical pressure gage
PM1 Pressure switch
P WIKA Pressure sensor
Vol Hose (2 m) as control volume
WAP 3/2 Inlet valve with red actuator
WST 5/2 Valve with white actuator