4/54
Bosch Rexroth AG, MIT: LU 2, 3 842 358 814/2017-01
6.8.3 Cable break detection 25
7 Transport and storage 26
7.1 Transporting the product 26
7.2 Storing the product 26
8 Installation 27
8.1 Unpacking 27
8.2 Installation requirements 27
8.2.1 Installation position 27
8.2.2 Mounting with T-bolts 27
8.3 Required tools 27
8.4 Symbols used 28
8.5 Installing the product 29
8.5.1 Install the holder for the lubrication unit LU 2 29
8.5.2 Install support bracket and connector set in the holder 30
8.5.3 Install lubrication unit LU 2 31
8.5.4 Install adapter Set AS 2/C-100, -250 33
8.5.5 Install adapter Set AS 2/C-400, AS 2/C-700 34
8.5.6 Install adapter Set AS 2/R-300, AS 2/R-700 35
8.5.7 Install adapter Set AS 2/R-1200, AS 2/R-2200 36
8.5.8 Install adapter Set AS 2/R-1200, AS 2/R-2200 37
8.6 Make the electrical connection to the product 38
8.6.1 PLC programming suggestions for evaluating the signal outputs 39
9 Start-up 41
9.1 First-time operation 41
9.1.1 Short description commissioning 42
9.2 Re-commissioning after a standstill period 42
10 Operation 43
10.1 Notices regarding operation 43
10.1.1 Wear 43
10.1.2 Steps for reducing wear 43
10.1.3 Environmental infl uences 43
11 Maintenance and repair 44
11.1 Cleaning and care 45
11.2 Inspection 45
11.3 Maintenance 45
11.4 Replacement of worn parts 45
11.4.1 Exchange oil container LC 2 46
11.4.2 Exchange battery LU 2 48
11.4.3 Replacement parts 48
12 Shutdown 49
13 Disassembly and replacement 49
13.1 Preparing the product for storage/further use 49
14 Disposal 50
15 Upgrading and modifi cation 50
16 Troubleshooting 51
17 Technical data 52
17.1 Storage period 52
17.2 Ambient conditions 53
358814_2017_01_EN.indd 4 16.01.2017 13:38:18