Company Registered in England No: 4167649 VAT Registration No: 732 5692 25 BS EN ISO 9001:2008 No: LRQ 0964389
+44 (0)1204 699959
enquiries@hyquip.co.uk
Hyquip Limited New Brunswick Street Horwich Bolton Lancashire BL6 7JB UK
www.hyquip.co.uk/web/index
18/48 Bosch Rexroth AG | Hydraulics Installation and operation | RE 30523-B/09.13
3 Commissioning the VSPD controller cards
3 Commissioning the VSPD controller cards
3.1 Providing readiness for operation
The procedure of commissioning the VSPD controller card depends on various factors
on site. For this reason, only basic commissioning steps can be described in these
instructions.
Making the controller card ready for operation:
¾ Carefully check cabling.
¾ Apply voltage to the VSPD controller card.
Fig. 4 Front panel of the VSPD controller card*
9 The controller card executes a short internal function test.
9 The display on the controller card shows the manufacturer name and version
number in scrolling text (when powered up) *
* only for VT-VSPD-1-2x/V0/1-0-1