59
M12/M15/M18
9. Control System and Programs 9.
Program sequence (example):
P09 2-bath for hard-to-dry garments/microfiber
with interval spinning
1
st
bath: Pre-cleaning in pump circuit,
30 seconds pumping from tank 1 to tank 1, solvent cooling,
45 seconds pumping up from tank I, pump circuit low level,
30 seconds draining of extraction tank,
2 minutes pump circuit,
1 minute 30 seconds pumping out and spinning to distillation.
2
nd
bath: Filtration
90 seconds pumping up from tank I in pump circuit, high level, addition
1 minute pumping from tank II, filter circuit high level,
7 minutes filtration,
30 seconds pumping to tank I,
1 minute spinning to tank I.
30 seconds spinning run down,
2 minutes spinning to tank I,
30 seconds spinning run down,
4 minutes spinning to tank I,
45 seconds spinning run down/tumbling.
Drying
12 minutes drying, high air flow, thermostat II 75 ° C (167 °F) *,
x minutes delay time, drying time controller,
2 - 6 minutes reduction (temperature-controlled)
* Depends on solvent
Wrinkle protection: If you do not press the STOP button at the cycle end, wrinkle
protection/deodorizing with gentle reversing continues to run. The
machine automatically stops and locks after a maximum of 10 minutes.
You cannot open it until program P43 has run.