11. Maintenance 11.
Attention:
Warranty claims will only be accepted if maintenance has been performed
properly! Follow safety regulations! All recommendations concerning
maintenance are minimum requirements
and refer to a one-shift operation!
11.1 Operation and Maintenance Summary 11.1
When starting operation:
Weekly:
Run multi-maintenance program P49 or run Turn on steam supply
Turn on room ventilation system alternative P46, P54 and P45
Turn on cooling water supply
Turn on compressed air supply
Clean the sprayer dirt strainers and
spray nozzles
Open condensate valve
Turn on machine main switch
Check limit switch function
Start deodorizing program P43, press "STOP"
button when program ends and
signal sounds.
Unbalance switch: Visual inspection for
damage. Check the central position of the
feeler in the Bore.
Monthly:
When stopping operation:
Execute multi-maintenance program P50
Turn off machine main switch Check solvent levels in the tanks
Turn off steam supply
Close condensate valve
Clean strainers in water and steam feeders
Lubricate cage bearing
Turn off cooling water supply
Turn off compressed air supply to compressor
Turn off room ventilation system or switch to
night operation
Semi-annually:
Have the flash point of the solvent checked
Inspection and maintenance work:
Check air cooler, clean
Daily:
(before starting the first cycle)
Clean tanks
Check machine for leaks Retighten screwed unions
Check solvent safety trough for solvent Check V-belt tension, re-tension
Drain water from compressed air armature
Clean button trap strainer and lint filter (see
11.5.1)
Annually:
Dispose of process water in accordance with
the regulations that apply in your country!
Machine inspection (according to
BGR 500 chapter 2.14)
Check the liquid level of the cleaning agent
container
Remove filter discs and clean in the
machine (program P6)
Check back wall of cage, clean Machine is ready for operation
Daily:
(after the last cycle)
Execute distillation maintenance program P45
Attention:
Immediately close the loading door
and maintenance openings again.
(Alternatively start with 15 E during the last
charge)
Use only lithium-based lubricating
greases, such as.
- ALVANIA 3 (SHELL) - MARSON L2 (FINA)
- BEACON 2 (ESSO) - LGMT 3 (SKF)