72
M12/M15/M18
11. Maintenance 11.
11.3 Maintenance Program Summary 11.3
P71 to P84
Free programming locations
P43
Deodorizing: Attention: Always select this if the loading door cannot
be opened.
The following maintenance programs are installed in the M12/M15/M18:
P44 Short drying
For afterdrying
P45 Distillation maintenance
Still stripping or program sequence "emission-free
still rake out (see Point 11.5.7)
P46 Filter 1 filter maintenance
Extraction of the filter disc, followed by still
stripping.
P47 Filter 2 filter maintenance
Extraction of the filter disc, followed by still
stripping.
P48
Adsorber maintenance (only
on PERC machines with
Slimsorba)
For desorption of the Slimsorba at times other than
during the cleaning cycles. The program has two
phases: desorption and carbon cool-down.
P49
Multi-maintenance 1
Combination of filter maintenance for filter 1,
Slimsorba maintenance, water separator
maintenance and distillation maintenance.
P50
Multi-maintenance 2
Combination of tank maintenance for tanks 1 + 2 +
3, spray nozzle rinsing and flushing of the drum
back plate
P51
Fill tanks
Fill the clean tank and then overflow into the work
tank and further into tank 3
P52
Prepare stock solution
Addition of drycleaning detergent into the solvent
from the work tank and tank 3 through a recipient
tank in the button trap.
P53
Drain extraction tank
Pump the extraction tank out to distillation
P54
Rinse the water separator
Automatic cleaning of the water separator
P55
Pumping out the distillation
residue
(only with emission-free still rake out system)
P56
From tank 1 to cage
For cleaning the work tank
P57
From tank 2 to cage
For cleaning the clean tank
P58
From tank 3 to cage
For cleaning the extra tank